We can build and install a secondary gas line from the meter to another building, all you have to do is dig the trench.
The B149 gas code requires a depth of at least 15″ in yards and 24″ under a commercial driveway or parking lot. Additional depth may be required where physical damage is likely to occur. It is also recommended to dig the trench at least 30″ at the riser locations as the risers are pre-bent and this prevents them from sticking too far out of the ground.
Be sure to let us know the total load for any additional appliances as the meter or regulator may need to be upgraded.